Froster Engineering was engaged to deliver the mechanical services design, working in close collaboration with Populous Architects to align system performance with the architectural vision.
This project required outside-the-box thinking to meet performance goals while managing operational and maintenance costs over the long term.
Our mechanical design focused on:
A few strategic design decisions, with a clear focus on the end user, resulted in a practical, streamlined solution that benefits all stakeholders — from athletes and staff to facilities managers.
This project is a strong example of how early engagement and master planning of mechanical systems can deliver significant results. By working closely with the architect from concept through to documentation, we ensured the mechanical systems supported the function, form, and future flexibility of the building.