The Pyms Health Centre in Mandurah is a new facility that brings together a medical health centre, office hub, and integrated fit-out. Froster Engineering was engaged to provide the mechanical services design for the entire development.
Froster Engineering offered a “whole is greater than the sum of its parts” mechanical solution.
This project is a clear example of the benefits that come from designing with a whole-building focus. Our team had the opportunity to act as both the base build and tenant fit-out engineering consultant for mechanical services — providing a cohesive and coordinated solution from day one.
This integrated approach allowed us to:
Froster Engineering’s involvement helped ensure that the final mechanical solution supports the needs of the facility, both now and into the future — with efficiency, flexibility, and function at the core of the design.